The challenge of the project is to create a real estate complex – 3 ESATs with shared functions (catering, administration, reception, storage, etc.). The extension was designed respecting the architectural principles of the existing building: a peri-urban industrial building showing a facade with a valued architectural style. The principle was developed for the design of the extension using contemporary materials.
Strong points
Design of the rehabilitation and extension ensuring overall consistency of the building complex
Resumption of the architectural design principle of the existing building to design the extension, in particular optimization of the sustainability / cost pair through the choice of materials